B Mine
Location:
Mueang,
Surin, Thailand.
Date:
18 July 2024
Size:
3 Phase, 25.00 kW
System:
Micro Inverter+Zero+Rapid
Inverter:
APsystems
Panel:
Longi 550W




Location:
Mueang,
Surin, Thailand.
Date:
18 July 2024
Size:
3 Phase, 25.00 kW
System:
Micro Inverter+Zero+Rapid
Inverter:
APsystems
Panel:
Longi 550W